The Green Mining CompanySM

Mining
done right.

Stewards of the earth. Suppliers to industry. Aaron Mining holds 300+ million metric tons of high quality magnetite ore reserves across the Pacific Northwest and is now seeking strategic investors.

Scroll
What we mine

Magnetite of exceptional grade, polymetallic potential.

Where we mine

Upper Pacific Northwest, claims filed and verifiable.

Why it matters

Raw material that builds homes, hospitals, computers, railroads.

Aaron Mining LLC is a Nevada limited liability company, founded in 2015, with additional registration in Washington State. We hold contiguous active mining claims near Concrete, Washington, in the Mount Baker and Snoqualmie National Forest magnetite belt of the Skagit County region. When developed, our sites will allow us to use environmentally responsible methods to provide the raw minerals and rare metals industry needs to grow economies and build everything from homes and hospitals to computers and railroads.

We are not the largest miner. We aim to be the most thoughtful. Our team brings more than a century of combined experience across mining, engineering, environmental remediation, and large-scale operations from Rio Tinto to the National Energy Technology Laboratory.

We are actively seeking investors who understand that responsible extraction is not a marketing line. It is a method.

0M+
Metric Tons
Magnetite Reserves
0%
Iron Concentration
After Processing
0+ yrs
Combined Team
Experience
0mi
From Multiple
Deepwater Seaports
Reserve Estimate
300,000,000 metric tons
02 /  Resources

A reserve of scale, a quality of distinction.

Aaron Mining LLC holds numerous mining claims near Concrete, Washington, in the Skagit County region, with a measured and indicated resource of 300 million metric tons of high-quality magnetite ore, plus millions of metric tons of silicon ore containing gold, silver, copper, and vanadium, alongside millions of tons of additional ore products. 35,000+ acres of additional prospective areas identified for future assessment.

  • 01 High-grade magnetite. A measured and indicated magnetite resource of 300 million metric tons across multiple contiguous claim sites.
  • 02 Polymetallic potential. Silicon ore on site contains gold, silver, copper, and vanadium in measurable concentrations.
  • 03 Publicly verifiable claims. All claims are filed and viewable through the Bureau of Land Management.
Verify our claims via the BLM Mineral and Land Records System →
03 /  Ore Quality

Magnetite of exceptional grade.

The magnetite ore on Aaron Mining's claims is high quality. Extraction and processing methods to be implemented at the site produce a magnetite concentrate grade of sixty nine point eight percent iron.

Processed · 0–5mm
Stockpile · ready
Natural · 50–100mm
Outcrop · field
Fe
69.8%
Iron Concentration After Processing

Verified by XRF mining testing.

Independent analysis confirms a 69.8% iron concentrate produced in the KM5675 test program, certified assay 69.70% iron, ALS Certificate VA18138068, with very low contaminant signatures across heavy metals. The table below is handheld field screening from sampling work, shown for indication only. It is not certified laboratory chemistry and does not stand in for the concentrate assay above.

All processed ore can be made into pellets upon request. Natural ore (50–100mm) is run through a jaw crusher only.

Natural Ore (50–100mm)
Jaw crusher only  /  handheld field screening, percent
Element Sample 01 Sample 02 Sample 03 Sample 04 Sample 05
Fe36.2147.5359.6261.9363.21
SiO22.962.460.961.192.31
Al2O30.0270.0170.0030.0010.015
CO0.03900.02300.01700.01000.0311
Ni0.03650.03420.01250.01010.0341
Cu0.0030.0030.0010.0020.002
P0.0130.0100.0020.0010.011
Zn0.00370.00400.00160.00260.0032
BaO6.624.260.610.575.80
Pb / Za / Mo / As / Cd<LOD across all samples

Values trace to ALS Canada laboratory certificates. Production specification Fe 69.8 percent.

04 /  Project Spotlight

Permits ready. Infrastructure in place.

A defined magnetite product, a scaled logistics plan, and a claim base ready for development.

Concentrate grade
Fe 69.8%
Pellet products
Fe 67.5% and Fe 65%
Phosphorus
0.028%
Alumina
0.34%
Silica, SiO2
1.42%
Annual capacity
3.15 MMt
Rail capacity
8.0 Mmtpa
Deepwater ports
Four Panamax capable
Tailings
On-site management
Road access
10.5 mi paved, 32.5 mi NFS roads
05 /  Land Status

39 claims. 795 acres. All current.

SKAGIT CO. · WA

Thirty-nine BLM mining claims across 795 acres, contiguous, filed and current under the General Mining Law of 1872 and 43 CFR 3800.

  • Claims
    39 BLM mining claims
  • Acreage
    795.08 acres, contiguous
  • Elevation
    1,200 to 4,300 feet
  • Governing law
    General Mining Law of 1872, 43 CFR 3800
  • Status
    All claims filed and current
  • Exploration
    35,000+ acres of additional prospective areas identified for future assessment.
  • BLM Record
    Claimant of record: Aaron Mining LLC, BLM customer ID 2432524. Administered by the BLM Oregon and Washington State Office under legacy lead files ORMC175381 and ORMC176626. Thirty-nine claims totaling 795.08 acres, located 2018 and 2019, all currently active.
Verify all 39 claims via BLM MLRS

Search the Mining Claims Customer Info Report using Administrative State: Oregon, and Claimant Name: Aaron Mining LLC. Washington claims are administered through the BLM Oregon and Washington State Office.

A steep roadside rock face on the claims. Dark exposed rock runs the width of the cut with rust-colored oxidation staining down the center, conifers stand along the top edge, and a person at the base gives scale.
Exposed magnetite outcrop at the claim site. The figure at the base gives scale.
Aerial survey image with the claim block drawn over it as a red grid of rectangular claims on forested terrain. Point Lake and Little Gee Lake sit to the west, an access road runs between them, and a marker labeled mine is pinned at the southern corner of the grid.
Claim block plotted over the aerial survey, Skagit County, Washington.
06 /  Environmental Responsibility

Green is a method, not a label.

When in operation, Aaron Mining LLC will use a unique method to greatly reduce or entirely eliminate negative environmental impacts. A significant portion of our energy needs will be met by renewable electric sources. Our goal is to be good stewards of the air, water, and land while economically producing the materials that drive our economy.

01

Transport & Crush

Ore from claim sites is transported to our processing facility and crushed to a fine powder, ready for systematic separation.

02

Extract & Concentrate

The latest available methods are used to systematically extract and concentrate each element from the milled feedstock.

03

Encapsulate Tailings

Remaining material is turned into concrete products that encapsulate the tailings, eliminating the major source of environmental concern in conventional mining.

04

Renewable Power

A significant portion of our energy needs will be met by renewable electric sources, designed in from the inception of operations.

Stewardship
The land we leave behind matters as much as what we extract.
07 /  Logistics

Built for delivery.

Our claim sites are positioned for efficient outbound logistics. Within striking distance of major seaports, mainline rail, and existing highway access. We coordinate shipping to your facility for on-time delivery.

Rail Access
28mi

Twenty-eight miles to existing mainline rail. Direct connection to the North American freight network for high-volume export.

Seaport Access
70mi

Seventy miles to deepwater port. Access to Anacortes, Everett, Bellingham, Seattle, Tacoma, and Longview for bulk magnetite export.

Roadway Access
100%

10.5 miles of paved road reach the site, with 32.5 miles of National Forest Service roads across the claims. No new road construction is required to begin operations.

Power
10.5mi

Three-phase power via Puget Sound Energy 10.5 miles away, with a hydroelectric source within one mile. Solar and satellite communications support on-site operations.

Regional map running from Sedro-Woolley in the north down to Seattle. Markers identify three mine sites in the eastern foothills, two stockpile sites, and a rail loading site, with Puget Sound, Whidbey and Camano islands and the Interstate 5 corridor to the west.
Claim sites in relation to the rail loading site and the Puget Sound ports.
08 /  Investment Opportunity

A reserve of scale.
A method that respects.

Aaron Mining LLC is seeking investors who can fund initial extraction operations. The quality and diversity of the minerals available on our claim sites is significant and carries the opportunity for substantial return. We provide interested investors with detailed information including a professional geological assessment, sample test results, and financial projections.

/ 01

Verified Reserves

BLM-filed claims, independent XRF analysis, professional geological assessments available to qualified investors.

/ 02

Operational Readiness

Existing road, rail, and seaport access. No greenfield infrastructure required to commence extraction.

/ 03

Experienced Team

Leadership drawn from Rio Tinto, the National Energy Technology Lab, and 100+ years of combined operating experience.

09 /  Leadership

A team built on depth.

Our leadership has more than a century of combined experience across mining, environmental remediation, large-scale operations, and federal research programs.

01
CEO
Riley D. Evans
CEO and Chairman of the Board

Riley D. Evans

38+ years · Mining, engineering, land development

Founder of AES Consultants in 1982. Led architects, civil engineers, and surveying professionals on commercial mining, civil engineering, and structural design across Washington State. Became COO of an environmental engineering firm in 2004 and helped create Aaron Mining in 2015 after locating a large iron ore deposit in Washington State.

02
President
Elizabeth Barlow Gupta
President · MSHA Certified

Elizabeth Barlow Gupta

Iron ore, mining asset management, Rio Tinto US & Australia

Held leadership positions in iron ore and mining asset management at Rio Tinto across the United States and Western Australia. Worked on AutoHaul, the world's first autonomous heavy-haul railway. Led Rio Tinto's first HVI project, valued at over 1 billion AUD. Launched Zero Harm at Kennecott Utah Copper.

03
Director
Paul King, PhD
Director

Paul King, PhD

CEO, Ampere Scientific · Former Director, NETL

CEO and President of Ampere Scientific, an Oregon company focused on specialty alloy production. From 2009 to 2014, served as Director of Partnerships, Outreach and Education at the National Energy Technology Laboratory in Albany, Oregon. Managed $80M+ in research programs across DOE, USGS, DOD, and DOI-BSEE.

04
CFO
Daniel Wolfley
Chief Financial Officer

Daniel Wolfley

Finance, capital planning, reporting

Directs financial strategy, capital planning, and investor reporting for Aaron Mining. Full biography available upon request.

05
Equipment
Peter Stojowski
Vice President, Equipment

Peter Stojowski

Fleet, machinery, site operations

Leads equipment acquisition, fleet readiness, and site machinery operations. Full biography available upon request.

06
Trucking
Bradley Salley
Vice President, Trucking

Bradley Salley

Haulage, routing, delivery

Oversees trucking logistics, haul routing, and outbound delivery operations. Full biography available upon request.

11 /  Contact

Open to conversation.

We are pleased to serve qualified investors, industrial buyers, and partners with our green mining operation. Reach out at any time.

Headquarters
4116 34th Ave NE, Building B
Everett, Washington 98201
Telephone
Mailing Address
PO Box 387
Concrete, WA 98237
Something went wrong. Please email [email protected] directly.
Message Received

Thank you. We will be in touch shortly.

Your message has gone to our team at [email protected].